Translate

HOA Meeting Minutes:

October HOA Meeting Minutes: 

10/08/13

Roll Call- Craig Tupper (President), Dawn Deber (Vice President), Leo Miller
(Member at Large), Kelly Schuler (Secretary), and Lorelei Dauenhauer (Edmonds
Landscaping Committee) met with Thomas Braile (Property Manager).
September Meeting Minutes approved by Board
Manager’s Report:
1. Clubhouse Re-key of the Pump room and Storage Lockers are done
2. Clubhouse 8 keys for the Clubhouse have been ordered. Replacement
keys are $50 to those who need one. There will be a key given freely to
the future owners of unit II-106 and II-306
3. Ken’s Pool Dawn was trained by Ken’s Pool for daily chemical
maintenance. Dawn suggests a training review for everyone in March
2014.
4. II-303 Deck cover Windows are yet to be installed on the enclosed deck. The
roof has been installed. The roofers will clean remaining refuse and debris
from the gutter once the windows have been installed. A letter will be sent to
owner from Property Manager to complete interior repairs. Board asks for
confirmation that work was/will be completed to full repair and satisfaction.
5. NW Roofing Service - dryer vent repairs began today. The foreman had
crew due additional venting (5 outputs instead of 4) and is estimating that
the additional work expenses will be $1500.00. This additional venting was
not in the original scope of work and was not signed off on by the Board
or the Property Manager. Further discussions will occur; Dawn is contact
person on site and have been allowed to approve charge changes.
6. Eviction Notice Sheriff should be by this week to post notice of eviction on
unit II-306.
7. Pond Cleaning Multiple bids given and are still pending. Approval will be
decided via email.
8. Light Doctor The overhead parking lot lights have been placed with
new bulbs. Leo ask that we move to LED’s for all lighting on all the units.
Suggestion acknowledged and tabled.
9. New Issues:
10.Need to get a phone # for unit 302 bldg 1
11.Window Cleaners Garden windows did not get cleaned.
12.Landscaping Getting bids for landscaping. Scope of work.
13.Winterizing of sprinkler system to be done by Leo.
14.Garage Doors 207 bldg 2 and 106 bldg 1 are in need of repair. Contractor
Creesy Door will be contacting owners to fix them. Have contractor provide
us with maintenance requirements for the doors. Owners should be doing on
maintenance garage doors. Bldg. 2 107 wants maintenance done.
15.Electrical Work in Garages II-106 and II-101 Found on inspection report,
II-106 and II-101 have outlets that need to be repaired. Tim at PMI electric
will be contacted by Property Manager.
16.Drainage and Gutter cleaning to be done by Tony Karr. Re-attach drains.
Draining for system around the garage by Tony Karr and spray the cobwebs
around the lights.
17.Tile @ 208 bldg 2 Tiles ordered by Tony.
18.Storage Hazard A letter will go to unit owner about proper storage of
flammables.
Old Business
19. Garden window unit 204 bldg 1 is on order
20. Garage Plumbing II-101 to contact Paris Plumbing to arrange time for
repair of faucet.

______________________________________________________

September HOA Meeting Minutes: 

09/10/13

1. Re-key the pump room.
2. Security company needs a key for the clubhouse.
3. A group of keys for the clubhouse were supposed to be made to cut the
expenses. If Quorum does not have them, they need to make a set of 10 or
more so that owners who do not have them can purchase them.
4. Ken’s Pool will be here on Friday at 11am. Ballinger Heights needs to be
informed. Ken’s Pool will try and have another time to do it. Maybe have
them schedule the training for early Spring before the pool opens next year.
Maybe video tape the training and put on the blog. People need to be trained
or $1000 to have Ken’s pool do all the testing.
5. 303 Bldg 2 deck cap will be completed. Letter to inform them they have 60
days to complete repairs of mold and water damage on the inside.
6. 303 Bldg 1, repair work has been done by Northwest Abatement.
7. October 1, 2, 3, 4 fixing of the venting on the roof. Norhtwest Roof Service
will be contacting the owners to get access. Make sure for access to Holland
unit 306 bldg 2.
8. What happens at the end of the 20 days on Nathan Holland Unit 306 bldg 2.
Costs for the security company added to those costs.
9. Pond cleaning. KOV no longer exists. Pursue new bids from new company’s.
10. According to PUD, the electrical bill looks correct based upon start-up energy
used to heat the pool at the beginning of the year.
11. Clubhouse committee needs to meet to bring pool area up to date.
12. Landscaping, getting bids.
13. Light Doctor to fix light in parking lot.
14. Skyline window needs to replace garden window on unit 204, bldg. 1.
15. Garage track needs to be repaired on unit 207, bldg. 2 and 106, bldg. 1.
16. Tile are coming loose. Bldg 2 unit 208. Tony Karr did work on landings
before, so have him do the work.
17. Camera to watch Nathan Holland unit as surveillance. Questionable on
legality of installation.
18. Unit #106 bldg. 1 clear out flammable materials under the stair (fire hazard),
and need to remove tires from garden.

Next Board Meeting, Tuesday, October 8, 2013 7:30pm

______________________________________________________

June HOA Meeting Minutes:


Roll Call: Kelly Schuler, Jim Schuler,  Lorelei Dauenhauer, Art Gumbel, Dawn Devers, Leo Miller, Craig Tupper, Brian Weaver, Terria Jeglum, Felix Taskar

Approval of May Minutes- approved.

Treasurer's report by Brian- last Treasurer's report is from March 2013

Manager's report by Felix- unable to be done, as Felix is not here.

Maintenance report by Art- Down spouts are now connected to common solid exhaust pipe in bldg. 2, so for each 2 columns there is now one pipe draining in to creek.

All valves (fresh water supply) to bldg. 2 have been installed, including valve to garages for bldg. 2. Each valve can regulate water supply to 6 units. Garage valve can now be turned off for winter. At this time a water leak was found and fixed behind unit II-106, and all other tees were visually checked. Plumbing drawings have been constructed by Leo Miller, for our files.

Ballinger Heights J pond was flooding over for 1-1/2 years. This leak worked its way into our foundation drain and driveway. To note, the water leak from the Ballinger Heights clean out box has been fixed.  The fix was to cap the 8" clean-out pipe with a 4" pipe in to a 2" pipe which has been routed into a storm drain. (This work has not been done under permit.) Their designed water system is not working correctly; their water should drain into the J pond, into the stream, and into our pond.
It seems clear that the water damage to our parking lot is directly related to the Ballinger Heights property flooding into our property.  Ballinger Heights will be held responsible for any further issues ensuing from this fix. To this end, Leo Miller will contact Mike Shaw, with the City of Mountlake Terrace to have the Ballinger Heights repair reviewed. Felix will inform Ballinger Heights that Mike Shaw is coming out.

Landscaping Report
- Mulch, Ivy, Unit A -All mulch is down with exception of a single Unit, the Ivy is nearly all removed.

Sprinklers have been serviced and are ready for season. Sprinkler by mail box has been fixed.

Clubhouse report by Craig- starting June it will be our responsibility to shut down/close up the pool at night.  Any volunteers??

Did we get the quote from Ken's Pool for timer?


Old Business:

Paris Plumbing- Felix has to report on this...

Tony to inspect repair II-205, paint? Home owner has repaired garage, bu painting is needed. Inspection will be done before  painting.

Parking lot lights, photo cell sensor- call PUD?

Roof repair- Felix has the report on this...

Delinquent accounts reviewed- Was discussed in close session amongst the HOA Board.


New business:

Window washing- "End of this month" window washing will be done... Felix has to report on this.

Unit #303 leaks- The capping of the roof deck will be completed. Felix will contact the homeowner of 303 directly with specifics and to schedule repair. 

Storage locker re-key- 5 deadbolts will be put in our existing storage closets and will be keyed the same.

House Rules Meeting: TB
Next Board Meeting: Tuesday July 9th
____________________________________________________________________________

May HOA Meeting Minutes: 

Roll Call- Craig Tupper (President), Dawn Deber (Vice President), Art Guembel (Member at Large), Leo Miller (Member at Large), Kelly Schuler (Secretary),  Brian Weaver (Treasurer), and  Lorelei Dauenhauer (Edmonds Landscaping Committee) met with Felix Rodriguez (Property Manager).

New Issues: 

Treasurers Report-  Brian and Felix simply cannot get together for reviewing the budget given their different hours of availability.  After much discussion, Dawn volunteered to meet with Felix over the next couple months. A treasurers report will be given at the next meeting.

Water Meters- Dawn has been working on all these bills in order to clear up which account to pay it out of.

Maintenance Logs- Art is reviewing all prior receipts in comparison to the reserve study in order to bring the reserve study into better focus of what is needed to be done in the future.

Joint Maintenance Agreement- There exists a dispute funding for the joint maintenance of the clubhouse between Ballinger Heights and Ballinger Point. Ballinger Heights claims "use rights" but not "ownership rights" therefore will not share clubhouse expenses 50/50. The board has voted to hire independent legal counsel to give an opinion on joint use agreement for the clubhouse.  James Stricker Law Office to look at.

Roof Issues-  Vents from dryers are not reaching the top vent on the roof, causing moisture build up and warping of the roofs. Potential dry rot.  Tony has visually checked from the roof all of the vents. Tony will need to get into units to fix the vents affected. The board has asked that  NW Roof Service (Rob Reader is the contact person) give us their opinion on the roof as well and give an inspection/quote for repair.   

Old Issues: 

Delinquent accounts reviewed- We are proceeding with Possession of Judgement on a homeowner's condo.  Felix will tell Condominium Law Group to proceed with Possession of Judgement. If we reach a receivership, we still have to pay to get the unit ready for renting.

Clubhouse- It has been determined that the spike in the electrical costs of the clubhouse are due to the pool heater & circulation pump. Ken's Pool will be contacted to adjust the heater & circulation pump. There was a question posed regarding the Clubhouse Reserve with discussion about decreasing how much we put in. (Tabled.)

Insurance- Multiple proposals where given and no one can beat our current insurers' (Alliance) quote (Earthquake/Flood/Fire/Liability). We will not be able to get earthquake in the future if we let it go now. (None is available via any other insurer.) Therefore, we have renewed with Alliance for $22,969.

Tree Trimming- Scott from Custom Tree Service gave us a bid of $700 for cleaning out the pond and trimming the Vine Maples. The board has approved the expenditure. Felix will contact Custom Tree Service to set schedule.

Garbage Dumpster- We have gotten different garbage dumpsters with built in lifts for the garbage tops.

Emergency Numbers- Felix will still needs to get us the laminated who to call sheets. "Welcome to your home package" is still Tabled.

Renters-  Felix has a list of renters and will contact the home owners to have them update information of who their tenants are.  Units being rented:

                                                              i.            AA
                                                           ii.            B1 301
                                                         iii.            B1 302
                                                          iv.            B2 108
                                                            v.            B2 208
                                                          vi.            B2 207
                                                       vii.            B2 303
                                                     viii.            Vacant B2 106


Landscaping- Tommy will be hired to fertilize, turn the soil and mulch. He has contracted with us for $4200 (beats Edmonds Landscaping). 

Parking Lot Asphalting- Repair will begin Thursday morning (05/16/13). Wednesday the parking lot will be coned off.  No prep on our part is necessary.  July  or August seems to be when the seal coating and then striping will happen.  Craig Will Call the fire dept. about fire lane. The sink hole will be investigated as repairs commence.

Parking Lot Lighting- Felix received a bid from Light Doctor for the Parking lot lighting. Craig will send info via email to us...

Plumbing-
1. Tony has made a big enough hole in the garage foundation of unit II-101 for Paris Plumbing company to finally begin repair. Paris Plumbing will contact the homeowner directly to finish repair.
2. Water Shut offs have been installed on three out of four building towers. The foundation drain has collapsed, and will need replaced. Bids need to be gathered.
3. Sprinkler System- Referral given by Tony Karr (Northern Waters); Felix will follow through.

Windows Replacement- This will have to be a special assessment to the owners of the buildings effected, given the projected cost (+$100,000).

House Rules Meeting: TB
Next Board Meeting: Tuesday June 11th
____________________________________________________________________________

March HOA Meeting Minutes: 

Roll Call- Craig Tupper (President), Dawn Deber (Vice President), Art Guembel (Member at Large), Leo Miller (Member at Large), Kelly Schuler (Secretary),  Brian Weaver (Treasurer), and  Lorelei Dauenhauer (Edmonds Landscaping Committee), Vicky Pinson (Club House Committee), Carol Rehnberg, and Herb Johnson met with Felix Rodriguez (Property Manager).

Reading CC&R's: Only 6 Board Members per CC&R’s. Decided that board members will be as listed in Roll Call. CC&Rs list that board positions are to be 3 year term, max. Ballinger Point will honor CC&Rs as of this date.

Garbage Dumpster: There is concern that some people are having difficulty with opening and closing the dumpster lid(s). Felix reported that "extra baggage" surcharge does occur when people leave trash on the ground. The board has asked Felix to look into finding a Cane/Poll/Claw to open and close the garbage dumpster.

Emergency Numbers: At the Annual Meeting a question was raised of “ Who do people call?” When there is an urgent/emergent need to have resolved. The board felt uncomfortable with giving the entire association their contact information. It was decided that the following would happen:
1.    Create a web page: Kelly will do
2.    Create a laminated who to call sheet: Felix will do
3.    Welcome to your home package: Tabled.

Renters: Home Owners have expressed concern regarding a lack of information on which units are currently being rented and who the tenants are. A Renter Cap has been rejected, because we would lose ability to have FHA. The Board has decided to follow the rules set forth in our CC&R’s. Felix will be contacting the Home Owners who are Renting out their units. Fees/Fines related to lack of information on the Home Owner’s part is now in affect.

Landscaping: We will be extending contract with Edmonds Landscaping for another year. They suggest mulching, but it would sap our $5k set aside. Felix will get bid from a landscaping company used by Ballinger Heights, and then this will be put to a vote.
Other maintenance concerns where regarding having ivy removed (lower dumpster area plants are being choked out) and the pond cleaned out. As Ivy is being removed, we would like to have plants put in.  The pond has not been cleaned in over a 1 1/2 years... Lastly, pruning of the vine maples are needed. Felix will contact Scott from Custom Tree Service for a quote.

Windows Replacement: PUD has a program good thru this year... Triple Pane windows and glass doors. Building 1 ($63000 with $11000 rebate via PUD), Building 2 ($80000 with $13200 rebate), and clubhouse ($13000, rebate not verified, paid for at %50 with Ballinger Heights.) Rebates will be honored regardless of going with double or triple pane, so Felix will be looking for double pane quote.  Craig said that owners that will not be having windows replaced should not have to pay for these windows. This will be a special assessment to the owners of the buildings effected.

Clubhouse: Electrical Costs of Clubhouse are through the roof. WHY???

Delinquent accounts reviewed: A homeowner has stopped payment and has a current debt of $5400. The litigation guarantee has been acknowledged... The Condo Law Group recommends a ‘Confession of Judgment’ approach. It is anticipated that it would cost $18000 to foreclose. The Board has voted to go forward with the Condo Law Group recommendation. Felix will email this document.

Parking Lot Repair: Seal Coating of the parking lot cannot take place without asphalt patching. The patching was not a planned expense. Asphalt patch is estimated at $13000. As much as it grieves the Board, the Board has voted in favor of proceeding with the patch work. (Seal Coating is another $10700, more than doubling our planned expenditures.) Felix will ask if larger concrete patch can be put in in front of garbage dumpsters in lieu of 4 inch asphalt. (Hopefully this will soften the expenses.) The paving company would put us on the books for June. Asphalt would be completed 30 days before Seal coat. A sink hole has been observed as well. Board has asked that this be investigated.

Water Valve(s) and Garage plumbing: Cracked valve or pipe water supply line at II 102 must be fixed urgently. This contaminates our entire water supply! This will be done in two stages:
1. Felix via Edmonds Landscaping or others to dig up this location
and other locations as identified by Dawn. 
2. Jim Dandy Plumbing or others to do the fix.This may run from $1500 and up depending on how many locations need to be repaired.

In addition, Paris Plumbing has yet to repair the garage plumbing within the garage of II-101. (This has been an ongoing issue for 2 years now.) Paris Plumbing reports willingness to complete the repair once some of the foundation concrete is chipped away. Tony Karr will be contacted to complete the task of chipping out the concrete.

·         Club House Meeting: next Tuesday.
·         Board Meeting: Tuesday 4/9.
·        House Rules Meeting: Tuesday 4/16.